COMMUNITY PROJECTS
Roof & Gutter Replacements
Chapel Hill has hired RD Kleinschmidt to re-shingle the roof and replace the gutters and down spouts on the condos outlined in red on the map. They will begin Monday, 4/7/2025 and anticipate completion by Friday, 4/11/2025, weather permitting.
• Please use caution around the construction area.
• You may want to remove pictures and other wall hangings on the second story that are not strongly secured so they do not fall
• Dust particulates are possible during construction; therefore, residents are advised that all doors, windows, and attic entrances remain closed during the process.
• All personal items, plants and furniture on the back or front yard must be covered or removed during the process, the contractors are not responsible for damaged items.
• All personal items in attics need to be covered or removed during construction.
Exterior Painting
The exterior painting project is set to begin in April. Our contractor will start power washing the siding during the week of April 28th to ensure the surfaces are properly prepped. Painting will then proceed in the order shown on the map provided.